About this space
The office building, constructed in 1990, is currently undergoing conversion, modernization and renovation.
Among other things, an air-conditioning system was installed on the 5th floor, a large emergency staircase was added, and more.
Walls were replastered (Q3), electrical systems renewed, sanitary facilities (2 facilities per floor) renovated, and kitchen areas (2 per floor) created.
The areas can be divided in half on each floor, i.e. 2x 315m² per floor, including sanitary facilities and kitchen.
Up to 4 floors are available.